MY EXPERTISES
SITE SUPERVISION
QUALITY CONTROL
Hands-on experience in construction material testing, including concrete and RCC products, with strict adherence to ASTM standards. Competent in sampling, testing, analysis, and reporting to ensure material performance, strength, and reliability.
Experienced in supervising construction activities to ensure work is executed in accordance with approved drawings, technical specifications, and project schedules. Focused on coordination, accuracy, and on-site compliance to achieve efficient and well-organized project delivery.
Strong background in implementing quality control procedures to maintain consistency, durability, and compliance with recognized standards. Skilled in inspections, verification of workmanship, and maintaining systematic quality records throughout construction and production processes.
MATERIAL TESTING
LATEST PROJECT
1.Sewerage Infrastructure Project
Role: Site Supervisor
Location: Sitara Gold
Organization: New Technical Associates
Responsible for on-site supervision of sewer work, ensuring compliance with approved drawings, technical specifications, and quality standards. Coordinated site activities, monitored workmanship, and supported timely and efficient project execution.


2.Sewerage Infrastructure Project
Role: Quality Control Engineer
Location: My Housing Society
Organization: New Technical Associates
Supervised sewerage construction activities and implemented quality control procedures to ensure compliance with approved drawings and technical standards. Conducted inspections, monitored workmanship, verified material quality, and maintained systematic quality records to support efficient and reliable project execution.


COMPANY FEEDBACK
CEO NEW TECHNICAL ASSOIATES
JAVED IQBAL
Ahmad Shehzad demonstrated a high level of professionalism, technical competence, and reliability during his role as Site Supervisor and Quality Control Engineer on the sewerage infrastructure project at My Housing Society. His attention to detail, adherence to technical standards, and structured working approach contributed significantly to maintaining construction quality and smooth site operations.